IMG_3333
| |
The National Weather Center viewed from the northwest at a spot near the model airplane port.
Date: 20060714
Views: 249
The National Weather Center viewed from the northwest at a spot near the model airplane port.
20060714
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
|
|
IMG_3416
|
Doug Forsyth, one of the principal building liaison people for NOAA, is giving a tour of the NWC.
The NWC main courtyard before it is finished. Even though we moved in, furniture installation, wiring, interior decor, and office infrastructure continues
Date: 20060725
Views: 217
Doug Forsyth, one of the principal building liaison people for NOAA, is giving a tour of the NWC.
The NWC main courtyard before it is finished. Even though we moved in, furniture installation, wiring, interior decor, and office infrastructure continues to be added at a furious pace.
20060725
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
|
|
|
IMG_3415
| |
The NWC main courtyard before it is finished. Even though we moved in, furniture installation, wiring, interior decor, and office infrastructure continues to be added at a furious pace.
Date: 20060725
Views: 282
The NWC main courtyard before it is finished. Even though we moved in, furniture installation, wiring, interior decor, and office infrastructure continues to be added at a furious pace.
20060725
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
|
|
IMG_3408
| |
Kenyon, Nazir, Xuechao and Don are stringing wire to connect our servers to the building network.
Date: 20060719
Views: 240
Kenyon, Nazir, Xuechao and Don are stringing wire to connect our servers to the building network.
20060719
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
|
|
|
IMG_3406
| |
Kenyon, Nazir, Xuechao and Don are stringing wire to connect our servers to the building network.
Date: 20060719
Views: 246
Kenyon, Nazir, Xuechao and Don are stringing wire to connect our servers to the building network.
20060719
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
|
|
IMG_3420
| |
Workers are installing the steel framework for the desk layout for WFO OUN. They're about 2 weeks from moving down from north campus.
Date: 20060727
Views: 238
Workers are installing the steel framework for the desk layout for WFO OUN. They're about 2 weeks from moving down from north campus.
20060727
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
|
|
|
IMG_3421
| |
Workers are also installing the steel framework for the SPC operations desks. SPC chose a square configuration instead. They'll be moving operations in early September. They'll be the last to move. Hopefully all the building "bugs" will be w
Date: 20060727
Views: 261
Workers are also installing the steel framework for the SPC operations desks. SPC chose a square configuration instead. They'll be moving operations in early September. They'll be the last to move. Hopefully all the building "bugs" will be worked out by then.
20060727
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
|
|
IMG_3422
| |
Bob is talking within the NWC where SPC forecasters will have their cubicles.
Date: 20060727
Views: 216
Bob is talking within the NWC where SPC forecasters will have their cubicles.
20060727
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
|
|
|
IMG_3500
| |
This is day 2 after the first day the WFO started operations at the NWC. Patrick Burke's logging onto the first AWIPS terminal turned on. There's only radar data coming in but it's a good start. The SADS displays are up but not yet connected to anythin
Date: 20060808
Views: 275
This is day 2 after the first day the WFO started operations at the NWC. Patrick Burke's logging onto the first AWIPS terminal turned on. There's only radar data coming in but it's a good start. The SADS displays are up but not yet connected to anything (all those monitors on the vertical poles).
20060808
|
RSS Feed for this Photo
View Slideshow
View Slideshow (Fullscreen)
|
| |